1 reviews | Active since Dec 2019
Thanks for the turn around time in which our infra structure wire's/ cables were replaced & reconnected the day after they were ripped out by ******* just after midnight on the 11th May 2022 in Boksburg replaced up an running on the 12th May 2022 by Themba ,Handsome,& Nkosi
© Copyright 2026 hellopeter.com and its affiliates. All rights reserved.