So I was well within my cooling off period and able to cancel my contract because there is no signal in my area, it proved to be a problem and I decided to let telkom upgrade me to a R239 package to avoid cancellation. My bill rockets to R1400 I dont know when or how how when even the previous contract was for R139
© Copyright 2026 hellopeter.com and its affiliates. All rights reserved.