I am deeply frustrated with the current state of Boston City Campus in Kempton Park. There has been NO electricity since last week, and absolutely no progress or communication about resolving the issue. This is unacceptable for an institution that prides itself on education and professionalism.

Students are expected to attend and keep up with their studies, yet we are left without access to critical resources. No backup power, no clear updates, and no contingency plans in place. It’s a complete disregard for students’ time, effort, and money.

We deserve better than silence and stagnation. This ongoing issue is severely impacting our academic progress and mental well-being. I hope management starts taking this seriously and addresses the problem immediately.

0
Replies (1)
Boston City Campus
Boston City Campus's reply15 Apr 2025, 10:13
Official
Dear Mama,
 
Thank you for your feedback. We sincerely apologise for the ongoing inconvenience caused by the vandalizing of power cables in the Kempton Park area.
 
Although we are equipped with superior inverter installations to cope with any load shedding, the recent spate of vandalizing power cables in our area has caught us by surprise.  
 
We are in the process of getting quotes to install solar power for the building, and hope to proceed with this soon.  In the meantime, now that we realise the repetitive nature of the power cable damage problem, we are arranging for a generator hire solution to cope with any unforeseen occurrences.
 
We do take our students and their education very seriously and have instituted direct messaging, to alert all students and their account payers, should the power be down, and to keep them fully informed as we receive notifications on restoration times.
 
Kind regards,