IV
IVAN V

1 reviews | Active since Jul 2015

15 Jul 2015, 14:11

POOR QUALITY UNRELIABLE AVOID AT ALL COSTS

I ACCEPTED A QUOTE TO HAVE MY DRIVEWAY DONE. INITIALLY VERY EFFICIENT, HOWEVER COMPLETION WAS RUSHED. COBBLE STONES ON PERIMETER ARE COVERED IN CEMENT AND TAR. <br> <br> TAR SURFACE IS IRREGULAR AND OF POOR QUALITY.<br> <br> CONTRACTOR WAS ASKED TO RECTIFY THE ABOVE. PROMISED HE WOULD ARRIVE THE NEXT DAY. NOTHING HAPPENED. THEN PROMISED HE WOULD BE THERE ON SATURDAY 13 JULY 2015. NEEDLESS TO SAY HE NEVER PITCHED.<br> <br> AVOID THEM AT ALL COSTS.

0
Replies (0)