PS
Pedro S
1 reviews | Active since Feb 2021
01 Mar 2021, 08:02
Warning
Left the site before build was complete. Hat water pipes installed next to cold in the floor slab. Now I have a hot water tap and a warm water tap. Numerous cracks with no come backs.
Helpful (0)
Replies (0)0
Replies (0)