PS
Pedro S

1 reviews | Active since Feb 2021

01 Mar 2021, 08:02

Warning

Left the site before build was complete. Hat water pipes installed next to cold in the floor slab. Now I have a hot water tap and a warm water tap. Numerous cracks with no come backs.

0
Replies (0)