PH
Priyesh H
1 reviews | Active since Apr 2021
29 Sept 2022, 16:32
Power solution = No loadshedding
Thank you to Prudence and team for finalising my installation. And taking the time to explain exactly how the system operates. The setup is working really well. No break in our power supply even at stage 6 loadshedding with 3 x 4hr power outages a day.
Helpful (0)
Replies (0)0
Replies (0)